Here are some pictures I snapped durring a visit to the new KMDE transmitter site - summer 2006 |
|
|
|
|
|
|
|
|
|
Looking up the tower |
|
|
|
|
|
 |
|
|
|
|
 |
|
|
|
|
|
|
|
|
The KMDE-DT Tower |
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
The control racks |
|
|
|
Harris Diamond Series Transmitter. |
|
|
|
|
The Dummy Load, Digital Mask Filter and transmission line Dehydrator |
|
|
|
|
|
|
|
|
In July of 2005, I was invited to visit the new PPTV digital high definition transmitter site near Devils Lake, ND. The following pictures show the transmitter and tower for the all new KMDE channel 25 under construction |
|
|
|
 |
|
 |
|
|
|
|
|
The tower partially up, only 500 feet to go. |
|
The building, tower base and ice bridge. |
|
|
|
 |
|
 |
|
|
|
Tower sections waiting to go up. |
|
|
|
 |
|
 |
|
|
|
Guy wire braces. |
|
|
|
 |
|
|
|
The antenna that will eventually sit on top of the tower. |
|
|
|
 |
|
 |
|
|
|
The partially installed Harris Diamond Series Transmitter. |
|
|
The transmitter control racks. |
|
|
|
|
|
|
 |
|
|
|
 |
|
|
|